Product Features
-Consisting of Neoprene and Spring.
-Need installation between minimum 3m to 15m
at vibration sensitive area.
-With proper enough hole size at the bottom of
hanger box, hanger load bar can move 30 at any
direction.
-Installing it in the middle of hanger rod not to
transmit vibration directly to building structure
through duct hanger rod or hanger rod of
equipment pending at ceiling.